10-22-2022, 06:18 PM
Hello,
The Date Format in Germany is DD.MM.YYYY
In the Attachment is the Save.log.
I configured two Jobs which does the same but one on a lokal drive and the other on a NAS (See Hasleo_jobs). Both are configured as daily und say that they worked fine until today, but the lokal Job (hasleo_Jobs2) has the right result in Type, Size, name but look at the date. All from 21 of October at the same time. The Job for the NAS could not delete the DBO Files between 11 October and 19th October but the DBI Files are not there (The picture shows the whole folder). But it looks like the last 3 days woks correct.
Greetings Udo Maaß
The Date Format in Germany is DD.MM.YYYY
In the Attachment is the Save.log.
I configured two Jobs which does the same but one on a lokal drive and the other on a NAS (See Hasleo_jobs). Both are configured as daily und say that they worked fine until today, but the lokal Job (hasleo_Jobs2) has the right result in Type, Size, name but look at the date. All from 21 of October at the same time. The Job for the NAS could not delete the DBO Files between 11 October and 19th October but the DBI Files are not there (The picture shows the whole folder). But it looks like the last 3 days woks correct.
Greetings Udo Maaß